Engineering | Biodiesel | Captive Power | Nigeria
Fortafric is an integrated company offering services in the oil, gas, and power sector of the Nigerian economy. We are a provider of sustainable services renowned for rendering premium solutions in a safe, cost-effective, efficient, and resourceful way. We are a leading provider of sustainable power solutions to residential, commercial and industrial clients. We specialize in delivering top-notch engineering solutions, services, and expertise to the oil, gas, and power industry. We specialise in delivering engineering solution, services and expertise to the oil, gas and power industry.
This company is:
Verified
Engineering and Power Plant Expertise | www.fortafric.com
CAPTIVE POWER PLANT | POWER PLANT EXPERTISE
Verified
Site Contract Services | www.fortafric.com
OPERATIONS | SITE CONTRACT SERVICES | Our site contract services prioritize the safety and efficient operation of your power asset. | OUR TEAM PROVIDE UNIQUE SOLUTIONS FOR EACH POWER PLANT REQUIREMENT
Verified
Projects | www.fortafric.com
OUR EXPERIENCE | OUR EXPERIENCE | Major inspection of a Frame V and retrofit from Mark II to Mark V and upgrade from <I> to HMI. Mark V controls. | Operation and Maintenance of Two MS5001 power generation turbines | Mark V Startup TA working on installation and startup of a New Compressor drive Frame six B and Frame 7 EA General Electric gas turbines. Mark V controls. | Start up Engineer working on Installation and Start up of a General Electric Frame 9E and the turn over of three other machine started previously. Mark V controls. | Daily support and emergency intervention to Ivorian Electricity Company. | Worked on the retrofit of the Turbine control system of Six Frame 7E General Electric Gas turbines from the old Mark 2 Speedtronic system to a Mark V Triple modular redundant Panel. Mark V controls. | Operation, trouble shooting, performance assessment and maintenance of the gas turbines and auxiliaries General Electric’s PG9171E (Frame 9). Maintenance, troubleshooting and configuration of GE MARK VI and MARK VIe control systems. | Prewiring of MK6e cabinets Remove old wiring and disassembling of the old cabinets Assembly and wiring of the new MK6e cabinets and start-up This was a fast track project and was a success story. | Realization of MI and CI revisions of gas turbines GE of all the area of Hassi Messaoud with instrumentation and control systems. Troubleshooting for Turbo-compressor/Turbo-generator, control panels MKII, MKIV, MKV (IDOS, HMI), MKVI and MARK Vie. | Provided technical direction for installation and Maintenance of General Electric Gas turbines. Duties included control system start-up and direction of turbine start-up and commissioning, analog and digital control system troubleshooting and root cause analysis, auxiliary support system commissioning, quality control, report generation, training of turbine operators and turbine instrumentation technicians. | Operation and Maintenance of FIAT TG20B turbines and MS7001 General Electric turbines and GEC Rolls Royce turbines. | Maintenance emergency response team on eight of its power plants. | GCP GENERATOR CONTROL PANEL Alternative and Continuous Auxiliary Tests. Test of Measuring Reducers (TC and TP). Tests of power transformer. Test of breaking devices (circuit breakers and disconnections):Interlocking, response time, control Command . Configuration and test of the protection system. Control / Command Test. | Worked on the retrofit of the Turbine control system of a thirty-year-old Frame 5L General Electric Gas turbine from the old Fuel regulator system to a Mark V Triple modular redundant Panel. My work scope was to install the new triple-redundant instrumentation and start-up the machine. Mark V controls.
View all products
Keywords
Industries
Recent Projects | www.fortafric.com
RECENT PROJECTS | RECENT PROJECTS | Provision of Specialist Resident Technical Support for the Gas Turbines. | Rehabilitation, Supply, and Installation of Gas Turbine Air-inlet Filters | Borescope Inspection, Rehabilitation and Cleaning of Gas Turbine | Provision of Specialist Resident Technical Support for the Gas Turbines and Heat Recovery Steam Generators | Turbine Maintenance Support and Intervention Services | Energy Consultant Service & Independent Power Producer (Gas-run IPP)
Where is Fortafric Energy Limited located?
The company Fortafric Energy Limited is located in Gwarinpa, Federal Capital Territory, Nigeria. It's worth noting that the company may has more corporate locations
How many employees does Fortafric Energy Limited approximately have?
As of the latest available information Fortafric Energy Limited has around 11-50 employees worldwide.
When was Fortafric Energy Limited founded?
Fortafric Energy Limited was founded in 2018
In which industries does Fortafric Energy Limited mainly work?
The company Fortafric Energy Limited has it's main focus in the industries of Energy
Forte Renewables
Netherlands
11-50 Employees
2012
Fortune Energy and Engineering Company Limited
Nigeria
51-100 Employees
Powerstore West Africa Limited
Nigeria
11-50 Employees
Nafric Intertrade Limited
Nigeria
1-10 Employees
Bridgsite Nigeria Limited (BNL)
Nigeria
51-100 Employees
1997
Greenpeg Engineering
Nigeria
11-50 Employees
2009
Tetracore Energy Group
Nigeria
11-50 Employees
AFS Energies
Nigeria
11-50 Employees
Topics which have been searched by others and may be interesting for you: